Projects
March 2019 - Pres - New Lidl store & s278 works, Chichester

Site Engineer on this new £6.5m retail development. Includes the diversion of the river lavant then building a new roundabout on Westhampnett Road, 100m of access road and a new Lidl store with 130 parking spaces

Jan 2019 - Mar 2019 - Stanbridge Earls Retirement Village, Romsey

Site Engineer on this new £35m retirement village. Setting out for numerous buildings, covering cfa piling, groundbeams, brickwork, pop ups, drainage and externals

June 2018 - Dec 2018 - Rolls Royce Car Park, Goodwood

Site Engineer on this new 550 space car park for Rolls Royce Motor Cars at Goodwood, West Sussex. 
Setting out and creating the 3d models for topsoil strip, cut and fill, 3d machine control dozer & excavator.

May 2017 - June 2018 - Berewood Infrastructure Rising Main and Phase13

Site Engineer, 1700m of 355 dia rising main, 450m of 375 dia gravity sewer 6m deep, 75m 2700 dia storage sewer and pump station with 8m deep wetwell, 6m deep inlet chamber, valve chamber and various above ground chambers, sub station and tanker storage area. Phase 13 is 290m of 6.1m wide road with associated drainage, suds ponds and another 8m deep pump station.see more.....

June 2016 - May 2017 - Wellesley Infrastructure, Aldershot

Site Engineer , Infrastructure (drainage, roads, footpaths, services etc) for Corunna which is phase 2 of the Wellesley, development at Aldershot. 5 no roads totalling 900 linear metres, with numerous belmouths off. All dug out and filled and trimmed using Leica Icon 3d machine control.see more...

Oct 2015 – June 2016 – Royal Mail Delivery Centre , Portsmouth

Site Engineer , groundworks and externals for new £6m delivery sorting office. Involves 60 pad foundations, 80 sets of holding down bolts, 3100m2 ground floor slab, dock leveller, retaining walls, car parking, 4400m2 PQ concrete service yard, drainage, services and new access road. Car park and access road has sub base surface water storage, in effect the car park "floats". Main Contractor is Wates Smartspace. see more...


Oct 2014 - Oct 2015 - £3m Berewood Infrastructure Phase 3, Waterlooville

Site Engineer at Berewood which will be 2500 home development and Careys have built several phases of the instructure. This particular phase is 3 no access roads totalling 900m with associated belmouths, footpaths, drainage, SUDS, services and landscaping etc. see more....

July 2014 - Oct 2014 - £7.5m Bognor Regis Northern Relief Road Viaduct

Site Engineer on this 16 span reinforced concrete and precast beam viaduct to cross over the London to Bognor Regis railway line and the Lidsey Rife water course, that completes the Bognor Regis bypass from the A259 to Felpham. see more.....


July 2013 - July 2014 - Portsmouth Flood Alleviation Scheme

Site Engineer on this £25m scheme to divert storm water away from Portsmouth's victorian combined system, which comprised of several sites that collectively alleviate the flooding. Schemes at Gruniesen Road, Norway Road, Quatremaine Road, 
Portsmouth Golf Centre, Tangiers Road and Fort Cumberland.see more....


Jan 2006 - July 2007 - Budds Farm Stw, Havant

Site engineer ASP3 nutrient removal scheme which is basically a 100m  x 70m x 10m high tank comprising RC slabs, walls, channels etc with large pipework in and out. see more...











March 2013 - Jun 2013 - Brighton & Hove Albion Training Academy, Lancing

Senior Engineer on this £20m scheme to provide premier league standard training facility for Brighton & Hove Albion Football Club, comprising 15 or so full size football pitches or different profiles and turf types, and a 2 storey building with extensive drainage and car parking. see more...

March 2010 - March 2013 The West Sussex Academies Framework

Overall the framework was worth about £120m, split over 4 schools. I was senior engineer on the £35m redevelopment of the Littlehampton Academy for 2 years and the £29m Sir Robert Woodard Academy for 10 months. I also had input into the £33m Shoreham Academy. see more...

April 2009 - Dec 2009 St Bartholomews School, Newbury

Site Engineer on this new £30m school building. see more...