St Bartholomews School, Newbury

Hired by Willmott Dixon

Apr 2010 - Dec 2010

Site Engineer on a £35m new build school, comprising 6 no 3 storey RC frames all converging a on a central hub, with a steel frame sports hall and energy centre.  The groundworks and the RC frame contractors supplied their own engineer, so basically i was responsible for progressing the site control, colouring in progress, surveys, as builts and pre pour inspections. When the groundworkers engineer was flat out i helped out, which basically meant i set out all the bolts for the 3 steel frames. There were extensive services cast into the ground floor slabs so i had ensure they "popped up" in the correct place. Once the frames were struck i then set out all the internal walls.