Budds Farm Sewage Treatment Works Havant
Hired by 4 Delivery
Jan 2006 - July 2007
This project involved demolition of an old bag storage area concrete slab, then 120x80m sheet piled box then reduced level dig on 3 different levels. Then 450 diameter stone column piles, then ground bearing slab with numerous 10m high walls with wier and pump structures that basically removed the nutrients from the sewage before returning water back into the sea. I set out the whole lot.