Infrastructure for phase 3 of the Berewood development at Waterlooville. Once complete there will be 2500 homes here with schools, opens spaces etc. 
Setting out for:
  • Newlands Avenue - 490m x 6.1m wide road with footpaths
  • Plant Farm Road - 290m x 6.1m wide road with footpaths
  • Winston Lane - 190m x 5.5m wide road with footpaths
  • 780m of kerbs & 1000m of extruded kerbrace
  • 11 x suds surface water storage tanks some 50x10x1.5m
  • 10 x downstream defenders
  • 12 swales and ditches
  • 75 manholes 1.2-1.8m diameter upto 2.5m deep
  • 4000m of drainage ranging from 150mmØ – 600mmØ
  • 65 gullies
  • 35 brick, block and flint headwalls
  • Gas pipe, water pipe , electricity cables and BT ducts up the full length of both roads
  • 15000m3 of arisings shifted and shaped upto Tower Park and the new cricket pitch area
  • 180m river restoration
  • Various stockpile, arisings, OGL and post fill surveys and as builts
  • Northern approach road to new bridge
  • Flexi-arch bridge over the river (I wasn’t involved with this)

Also for Careys setting out piles on student accommodation block in Portsmouth and setting out / engineering control for new machine base at BMW Swindon