Freelance engineer working via the agencies, some long some short term jobs / holiday cover etc
(Aug07- Apr09)
• 2 wks setting out brickwork and lining up steel frame for Vinci
at Winchester Waitrose
• 3 wks setting out pads, beams and bolts for Morgan Ashurst
at Fareham Hospital
• 4 wks setting out foundations for AK Warren
at East Gate Square, Chichester
• 27 wks setting out all groundworks, drainage, pads, bolts, car park etc for AK Warren
at Sunrise Senior Living Winchester
• 13 wks setting out substructure for Galton
on Fareham Shopping Centre extension
• 12 wks surveys and checking for Warings
at the Swan Centre Eastleigh, BAT Southampton, SSE in Havant and retirement village at Southampton
• 6 wks setting out kerbs and edgings for Britannia
at Old Sarum, Salisbury
• 4 wks setting out for slabs, walls and columns for Whelan & Grant
at Carnival UK
• 3 wks setting out foundations, brickwork, kerbs for John Reilly
at Four Marks
• 10 wks setting out service yard – drainage, slabs, retaining walls for Euro Earthworks
on Carnival UK office in Southampton
• 13 wks all foundations and drainage on 3 blocks of flats for Woodmace
in Portsmouth